Halscombe Lane

A chilly northerly decided the scout against a longer ride and instead he went from Marsh Barton to have a look at the recent work done at Halscombe by National Highways.

Halscombe Lane is a “no through road” off Westown Road, which continues from Station Road in Ide.

What determined that there is an embankment at Halscombe, instead of a viaduct, must have been the vast amount of earth produced by the neighbouring cuttings. In this view from Westown Road, Halscombe Lane can be seen at middle right. When the trees come into leaf, the track level will be obscured.
Unusually, the E.R. Gradient Diagram shows the ground profile and it can be seen how the surveyors designed the earthworks to be in balance as far as possible, with excavated material being only enough for the embankments, allowing for tipped material having a greater bulk.
The embankment at Halscombe, the highest on the line and the whole route, can be seen just beyond the easing of the gradient through Ide. +

The lane could have been raised up to a much smaller bridge built on newly made ground, but this would have been unwise. The lane could have been taken up the hillside to a much smaller bridge built on firm ground. A bridge like that over Dalditch Lane, the “Million Brick Bridge,” on the Tipton St. John’s to Exmouth line, with massive wing walls and the arch just beneath track level, could have been built.

It will never be known quite why the engineer chose to build a bridge which carried much of the embankment.

Right: Dalditch Lane Bridge.

This entry was posted in Uncategorised. Bookmark the permalink.